uc_menu_prodold.ascx
 
 
  Magnum magnets
Model description, all magnets
 
Clean up magnets
Model description, all magnets
 
InnoMag
 
Magnetic Mudfilter
 
Innovar Jet Bailor
 
Geo Drive
 
The Innovar Solution
 
Picture gallery
 

InnoMag

Patent pending.

 

 

“Wellbore debris is blamed for a third of
all failed completions, effectively
depressing your bottom line through
remedial work over trips, down hole
equipment failure, not to mention the
risk of a plugged or otherwise damaged
formation crippling production”
 
(source: Weatherford)
 

 

- The use of strong magnets for fishing out pieces of metal lost in the hole has proven to be a quick and relatively inexpensive method for debris removal.

- The last few years, the use of magnets as an integral part of a completion string has proven to increase the success of virtually any completion run.

- The safety enhancement of removing metallic debris is obvious and in particular when it comes to removing metallic debris from the BOP and marine riser.

 

 

 

 

 
- Run as part of the drill string
 
- During normal drilling operations
 
- When doing a washing or circulation run
 
- During or after milling when cleaning up
 
- Large magnetic area, magnets covered in stainless steel to make maintenance and cleaning  easy
 
- Magnetic field directed out towards casing and well cavities
 
- Extreme magnet range, due to the large magnet mass
 
- Large fluid bypass
 
- Rotating stabilisers and magnet sleeve, reduces wear of the magnets and casing, increases effectiveness of
debris removal
 
 
Available for 7”,  9 5/8”, 10 ¾” & 13 3/8” csg.
 
 
 
 

 
 
.
 
 
 
 
 
 
  Innovar Solutions AS - Flyplassveien 229, 4050 Sola - post@innovar.no - + 47 9544 9500  

© Hjelseth Computers